It adopts the matured worldwide-standardized way of preform feed-in and unscrambling, in which preforms go through preform elevator and are transmitted to preform unscrambler.inside the preform unscrambler, preforms are automatically sorted and delivered by two inclined revolying cylinders with same speed, and the remaining ones will be picked by star wheel and sent back to preform hopper. The whole process of preform unscrambling is fully automatic and has high efficiency without preform scratches.
Heating furnace design turn the bottle preform, bottle preform into the furnace by the flip agencies make Canon of infrared heating tube, bottle mouth downward in the furnace to flip again before the furnace into the main blow round, to focus on in order to protect the bottle, 3025, 29251881, such as bottle, thin, short, easy to deformation in the process of heating, turning after the bottle upside down, The BOTTLE mouth IS well protected from deformation by shading plate, cool-ing channel and fan, and the energy saving is at least 20% compared with the unturned heating furnace. At the same time, the specially designed ventilation cooling device and protective plate cooling water in the heating furnace to prevent the furnace temperature is too high and the specialair duct cold water billet pipe thread part, the cooling air is controlled by the frequency conversionfan, arbitrary wind can be adiusted, so that the furnace temperature is constant and consistent And extend the life of infrared lamp tube;
1.Humanization man-machine interface. lt's easy to learn the operation of man-machine inter-face, because there will be the breakdown position and explanation.Every solenoid valve and cylinder can be checked to separately control every mold to blow bottles. 2.Recycle the high blow air, so no need to build low pressure air station. 3.with perform block inspect device, when any perform blocked, it will reject automatically and recovery automatically. 4.Less time mold change time, can improve the production.
Title goes here.
Suzhou New Crown Machine, located in Suzhou City, China, plans, develops and manufactures machines and complete lines for the fields of process, filling and packaging technology. lts product portfolio is rounded off by information technology and factory planning. As an international technology group, the Company focuses on world-leading process technology and components for sophisticated production processes.
1.When can arrange the delivery after customers place the order ?
A: Normally production time is around 60-90 days,the exactly depend on what kind of machine you ordered ..
2.How long time for installation?
A: According to your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks
3.What kind payment be accepted by New Crown?
A: We can accept L/C, Western Union, T/T.
4.How to install my machines when it arrives? how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff howto operate the machines. Customer pays air tickets go and back,accommodation,food,and soon.
5.Installation and maintenance:
A:The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from New Crown, or we can sent our engineers to help you.
>= 1 مجموعة
١٩٠٬٨٧٥٫٠٠ ر.س.
الأشكال
إجمالي الخيارات:1 قوة;1 رقم الموديل;4 ماكينات قدرة.